Bills of materials

Write a product's recipe once, with materials and operations, and plan every run from it.

Updated 21 Oct 2026

A bill of materials (BOM) is a product's recipe: what goes into one batch and how it's made. Go to Manufacturing → Bills of materials and click New.

Create a BOM

  1. Choose the product this BOM makes.
  2. Enter the output quantity and unit the recipe is written for, for example 10,000 strips.
  3. Add a line for each material, with the quantity needed for that output.
  4. Save. The BOM starts as a draft.

Operations (routing)

On the BOM, add the operations in order, for example Granulation → Compression → Coating → Packing. For each one, choose the work centre it runs on and how long it takes. When you plan a run from this BOM, its operations are booked onto those work centres in the production schedule.

Versions and status

Status Meaning
Draft Being written. Can't be used for runs.
Active The current recipe. New runs use it.
Archived Replaced by a newer version. Kept for the record.

To change a recipe, create a new version and make it active. The old version is archived, and runs already planned keep the version they were planned with. Your batch records always show the exact recipe each batch was made to.

Material requirements

Bills of materials → Requirements adds up the materials needed for all planned runs, and compares them with stock. Use it to see what to buy before production starts.