QA release and non-conformance
Test a batch, release or reject it, and handle non-conformances with corrective actions.
Every batch that comes out of a production run starts in quarantine. It can't be sold or dispatched until QA releases it.
The QA queue
Manufacturing → QA Release lists batches awaiting a decision. Open one to see its production run, BMR status, tests and documents.
Tests and documents
- Tests: add each test from the specification (assay, dissolution, moisture and so on) with its result. Mark each one passed or failed.
- Documents: attach the certificate of analysis, lab reports and anything else QA relied on.
Release
Click Release and add a note if needed. A batch can only be released when:
- its BMR is complete, with every step performed and verified;
- all of its tests have passed.
Otherwise the screen tells you what's missing. The decision records who released the batch and when.
Reject
Click Reject and give a reason, which is required. Rejection is final: a rejected batch can never be released later, so the record always shows that it failed. If the material is reworked, it becomes a new batch.
Non-conformance (NCR)
When something goes wrong (an out-of-spec result, a deviation or a complaint), raise an NCR under Non-conformance:
- Describe what happened, and link the batch.
- Add corrective actions, each with an owner.
- Each owner marks their action done, and someone else verifies it.
- Close the NCR when every action is verified.