Cable & Wire Manufacturing ERP from copper rod to BIS-marked coil
House wires, power and control cables, flexibles — copper and compound by lot, drawing and extrusion runs, IS tests, coil and drum stock, and dealer dispatch in one system, with GST billing built in.
Every production run, from materials to dispatch
The run carries its bill of materials, the material lots it used, the batch record filled step by step, the QC tests and the release — so production, QA and dispatch work from the same record.
- Materials checked against stock before the run starts
- Every step performed by one person and verified by another
- Batch released only when every test passes, then shipped batch-wise
What is software for cable and wire makers?
Cable & Wire Manufacturing ERP runs a cable and wire plant in one system: copper and aluminium rod, PVC and XLPE compound by lot, the material per coil or drum, drawing, bunching and extrusion runs, the batch record with in-line spark test, conductor resistance and HV tests, and dispatch to dealers and projects — with GST invoices, e-way bills and the accounts on the same records.
ERP Group keeps size, cores, insulation, voltage grade and the IS standard on each product, works out the copper and compound a run needs, flags a shortage before the line starts, and holds the batch until its tests pass.
Last updated: October 2026 · features as they work in ERP Group today
Key facts
| Built for | House wire, power, control and flexible cable makers, BIS licensees |
|---|---|
| Bill of materials | Copper or aluminium, compound and packing per coil or drum |
| Quality | Conductor resistance, High-voltage test, Insulation thickness |
| Batch record | Rod breakdown & wire drawing to Coiling & packing, each step verified |
| Accounts | GST invoices, e-way bills, books; or export to Busy or Tally |
What ERP Group does for a cable and wire plant
Materials, production, quality and dispatch on one set of screens — with the stock and the books kept up to date as you go.
Products and specifications
- Size, cores and insulation
- Voltage grade and IS standard
- Coil length or drum on each product
- BIS licence on the label
Rod and compound store
- Copper and aluminium rod by lot
- PVC, XLPE and FR compounds
- Purchase orders and goods receipt
- Reorder levels with draft orders
Line runs
- Plan a run on each line
- Shortage shown before the run starts
- Material lots issued to the run
- Labour hours and actual output recorded
Batch record
- Rod breakdown & wire drawing, Annealing, Bunching / stranding and more
- Each step performed and verified by two people
- Deviations recorded on the batch
- Locked once the batch is released
Quality checks
- Conductor resistance, High-voltage test
- Insulation thickness
- Release, reject or raise a non-conformance
- Test reports attached to the batch
Dealers and projects
- Orders from dealers, electricians and projects
- Dispatch batch-wise, coil and drum numbers
- GST invoice, e-invoice and e-way bill
- Outstanding and collections per customer
What do the plant screens look like?
Real screens from an ERP Group demo cable and wire plant — the wires and cables, materials and batches are demo data.
View larger
Manufacturing overview
Open runs, batches waiting for QA, released and rejected batches, average yield and deviations — with yield by recent run.
- Yield against tolerance
- Quality disposition at a glance
- Runs by status
View larger
Production runs
Every run with its product, batch number, quantity, line and status — planned, in progress or completed.
- Plan a run from the BOM
- Filter by status or product
- Open any run for its record
View larger
One production run
The run for House Wire 1.5 sq mm FR (90 m): planned quantity, target batch, line and supervisor, with every material checked against stock — Copper Rod 8 mm (ETP) is short.
- Shortage shown before you start
- Labour hours booked to the run
- Start, close, QC and release
View larger
Bill of materials
What goes into a 90 m coil of house wire: each material with its quantity, wastage and stock, in versions — plus the routing on your lines.
- Versions kept, old runs unchanged
- Wastage % per material
- Routing steps on work centres
View larger
Batch record
Every step of batch W15-2609-28: what was expected, what was observed, who performed it and who verified it — closed once the batch is released.
- Two people per step
- Deviations block the release
- Locked after release
View larger
QC and release
Theoretical against actual quantity, every QC test with its specification and result, test reports attached, and the release decision.
- Pass / fail against the spec
- Non-conformance and CAPA
- Released for dispatch
See a plant run on ERP Group
A walk-through of the production screens — shown for a general manufacturing unit; cable & wire manufacturing businesses work in the same screens, with their own materials, steps and tests.
- PlanBills of materials and production runs
- Make and checkBatch record, QC tests and release
- DispatchSales orders, invoices and shipments by batch
Resistance, spark and dimensions checked before a coil is packed
Each batch has a batch record with these steps, and QC tests against your specification. A step needs a second person to verify it, and the batch cannot be released while a step is open or a test has failed.
How is ERP Group different from Excel and Tally, or a separate production package?
Most cable and wire makers plan production in Excel and keep the accounts in Tally or Busy, or buy a production package that does not talk to the books. Here is what changes when it is one system.
| What you need | Excel + Tally / BusyThe usual start | Production package + TallyTwo systems | ERP GroupOne system |
|---|---|---|---|
| Bill of materials with wastage, in versions | A sheet per product | Yes | Yes, old runs keep their version |
| Material shortage before the run starts | Found on the floor | Varies | Yes, checked against live stock |
| Batch record: who did each step and who checked it | Paper registers | Varies | Yes, two people per step |
| QC tests and release before dispatch | Lab register | Usually | Yes — no release, no dispatch |
| Material lots used in each batch | Not recorded | Partly | Yes, lot by lot |
| GST invoice, e-invoice and e-way bill | Typed again in Tally | Entered again in Tally | From the sales order itself |
| Purchase orders, goods receipt and reorder levels | In Tally, by hand | Varies | Yes, draft orders when stock runs low |
| Books, GST data and bank reconciliation | In Tally, separately | In Tally, kept in step by hand | Built in — or export to Busy / Tally |
| Payroll, CRM, dealers and the rest | More software | More software | Same login, add when needed |
"Varies" and "usually": production packages differ — ask your vendor. ERP Group columns are what the software does today.
See it on a demoWhat does cable & wire manufacturing erp cost?
Three plans, all with GST billing and stock built in. Prices before GST.
1 plant · 3 users
- Products and materials, stock by store
- Purchase orders and goods receipt
- Sales orders, GST invoices, e-way bill
- Reorder levels and draft orders
- Stock and sales reports
1 plant · 10 users
- Everything in Starter
- Bills of materials and production runs
- Batch records and QC release
- Batch-wise dispatch and recall
- Accounts, GST data and bank reconciliation
Up to 3 plants · 25 users
- Everything in Factory
- Stock and staff per plant, with transfers
- Production schedule on work centres
- Dealers, distributors and their orders
- Payroll and HR for the plant
Compare: accounts software alone is ₹22,500+ one-time (TallyPrime Silver), and a separate production package adds its own licence and yearly fee — with the accounts still kept apart.
See the comparisonFree demo · free Tally / Busy data migration · more plants or users on request. TallyPrime price is its public list price as of October 2026.
The modules a cable and wire plant runs on
Production shares its materials, batches and invoices with the rest of ERP Group.
Inventory & Warehouse
Stores, bins and stock by lot — raw materials, work in progress and finished goods.
Warehouse managementPurchase
Purchase orders to copper rod, compound and packing suppliers, goods receipt, reorder levels and draft orders.
Purchase managementAccounting & GST
Purchase bills, sales invoices, ledgers, GST data and bank reconciliation.
Accounting softwareE-Invoice & E-Way Bill
IRN and signed QR on every invoice, e-way bills for each dispatch.
E-invoice & e-way billDealer Management
Your dealers and distributors, their orders, schemes and outstanding.
Dealer managementTraceability
Batch QR codes, shipments by batch, and a recall that finds every customer.
Traceability softwareHow does a cable and wire plant start on ERP Group?
More for manufacturers
See your plant on ERP Group
Tell us which wires and cables you make and how many lines you run. We'll show you a run from copper rod to the HV test and dealer dispatch on a demo cable plant.