Ceramic Tiles & Sanitaryware ERP shade, calibre and grade on every box
Vitrified, ceramic and GVT tile and sanitaryware makers — clay and glaze by lot, kiln runs, shade and calibre sorting, IS 13630 tests, and dealer dispatch in one system, with GST billing built in.
Every production run, from materials to dispatch
The run carries its bill of materials, the material lots it used, the batch record filled step by step, the QC tests and the release — so production, QA and dispatch work from the same record.
- Materials checked against stock before the run starts
- Every step performed by one person and verified by another
- Batch released only when every test passes, then shipped batch-wise
What is software for tile and sanitaryware makers?
Ceramic Tiles & Sanitaryware ERP runs a tile or sanitaryware plant in one system: clay, feldspar, quartz, glazes and inks by lot, the body and glaze per box, ball mill to kiln runs, the batch record from body preparation to sorting, water absorption, breaking strength and shade checks, and dispatch to dealers and projects — with GST invoices, e-way bills and the accounts on the same records.
ERP Group keeps size, surface, design, tiles per box and sq m per box on each product, works out the raw materials a run needs, flags a shortage before pressing starts, and keeps stock by grade, shade and calibre so dealers get matching boxes.
Last updated: October 2026 · features as they work in ERP Group today
Key facts
| Built for | Vitrified, GVT, ceramic wall and floor tile makers; sanitaryware plants (Morbi and beyond) |
|---|---|
| Bill of materials | Clay, feldspar, quartz, glaze, ink and boxes per box, with wastage |
| Quality | Water absorption, Breaking strength, Shade & calibre sorting |
| Batch record | Body preparation (ball mill) to Sorting & packing, each step verified |
| Accounts | GST invoices, e-way bills, books; or export to Busy or Tally |
What ERP Group does for a tile and sanitaryware plant
Materials, production, quality and dispatch on one set of screens — with the stock and the books kept up to date as you go.
Designs and sizes
- Size, surface and design name
- Tiles and sq m per box
- Grade: premium, standard, commercial
- Shade and calibre on every box
Body and glaze store
- Clay, feldspar and quartz by lot
- Glazes and digital inks
- Purchase orders and goods receipt
- Reorder levels with draft orders
Kiln line runs
- Plan a run on each kiln line
- Shortage shown before the run starts
- Material lots issued to the run
- Labour hours and actual output recorded
Batch record
- Body preparation (ball mill), Spray drying, Pressing and more
- Each step performed and verified by two people
- Deviations recorded on the batch
- Locked once the batch is released
Quality checks
- Water absorption, Breaking strength
- Shade & calibre sorting
- Release, reject or raise a non-conformance
- Test reports attached to the batch
Dealers and projects
- Orders from dealers and builders
- Dispatch by shade and calibre, batch-wise
- GST invoice, e-invoice and e-way bill
- Outstanding and collections per customer
What do the plant screens look like?
Real screens from an ERP Group demo tile and sanitaryware plant — the tiles and sanitaryware, materials and batches are demo data.
View larger
Manufacturing overview
Open runs, batches waiting for QA, released and rejected batches, average yield and deviations — with yield by recent run.
- Yield against tolerance
- Quality disposition at a glance
- Runs by status
View larger
Production runs
Every run with its product, batch number, quantity, kiln line and status — planned, in progress or completed.
- Plan a run from the BOM
- Filter by status or product
- Open any run for its record
View larger
One production run
The run for GVT 600 × 600 Matt — Statuario Grey: planned quantity, target batch, kiln line and supervisor, with every material checked against stock — Potash Feldspar (200 mesh) is short.
- Shortage shown before you start
- Labour hours booked to the run
- Start, close, QC and release
View larger
Bill of materials
What goes into a box of 600 × 600 tiles: each material with its quantity, wastage and stock, in versions — plus the routing on your kiln lines.
- Versions kept, old runs unchanged
- Wastage % per material
- Routing steps on work centres
View larger
Batch record
Every step of batch GVT-2609-44: what was expected, what was observed, who performed it and who verified it — closed once the batch is released.
- Two people per step
- Deviations block the release
- Locked after release
View larger
QC and release
Theoretical against actual quantity, every QC test with its specification and result, test reports attached, and the release decision.
- Pass / fail against the spec
- Non-conformance and CAPA
- Released for dispatch
See a plant run on ERP Group
A walk-through of the production screens — shown for a general manufacturing unit; ceramic tiles & sanitaryware businesses work in the same screens, with their own materials, steps and tests.
- PlanBills of materials and production runs
- Make and checkBatch record, QC tests and release
- DispatchSales orders, invoices and shipments by batch
Absorption, breaking strength and shade before a box is sealed
Each batch has a batch record with these steps, and QC tests against your specification. A step needs a second person to verify it, and the batch cannot be released while a step is open or a test has failed.
How is ERP Group different from Excel and Tally, or a separate production package?
Most tile and sanitaryware makers plan production in Excel and keep the accounts in Tally or Busy, or buy a production package that does not talk to the books. Here is what changes when it is one system.
| What you need | Excel + Tally / BusyThe usual start | Production package + TallyTwo systems | ERP GroupOne system |
|---|---|---|---|
| Bill of materials with wastage, in versions | A sheet per product | Yes | Yes, old runs keep their version |
| Material shortage before the run starts | Found on the floor | Varies | Yes, checked against live stock |
| Batch record: who did each step and who checked it | Paper registers | Varies | Yes, two people per step |
| QC tests and release before dispatch | Lab register | Usually | Yes — no release, no dispatch |
| Material lots used in each batch | Not recorded | Partly | Yes, lot by lot |
| GST invoice, e-invoice and e-way bill | Typed again in Tally | Entered again in Tally | From the sales order itself |
| Purchase orders, goods receipt and reorder levels | In Tally, by hand | Varies | Yes, draft orders when stock runs low |
| Books, GST data and bank reconciliation | In Tally, separately | In Tally, kept in step by hand | Built in — or export to Busy / Tally |
| Payroll, CRM, dealers and the rest | More software | More software | Same login, add when needed |
"Varies" and "usually": production packages differ — ask your vendor. ERP Group columns are what the software does today.
See it on a demoThe modules a tile and sanitaryware plant runs on
Production shares its materials, batches and invoices with the rest of ERP Group.
Inventory & Warehouse
Stores, bins and stock by lot — raw materials, work in progress and finished goods.
Warehouse managementPurchase
Purchase orders to clay, feldspar, glaze and box suppliers, goods receipt, reorder levels and draft orders.
Purchase managementAccounting & GST
Purchase bills, sales invoices, ledgers, GST data and bank reconciliation.
Accounting softwareE-Invoice & E-Way Bill
IRN and signed QR on every invoice, e-way bills for each dispatch.
E-invoice & e-way billDealer Management
Your dealers and distributors, their orders, schemes and outstanding.
Dealer managementTraceability
Batch QR codes, shipments by batch, and a recall that finds every customer.
Traceability softwareHow does a tile and sanitaryware plant start on ERP Group?
More for manufacturers
See your plant on ERP Group
Tell us which sizes and designs you make and how many kilns you run. We'll show you a run from body preparation to shade sorting and dealer dispatch on a demo tile plant.