Electrical & Electronics Manufacturing ERP from component to carton
LED lighting, fans, switches, wires and small appliances — components by reel and lot, assembly runs, burn-in and safety tests, BIS labelling and dispatch in one system, with GST billing built in.
Every production run, from materials to dispatch
The run carries its bill of materials, the material lots it used, the batch record filled step by step, the QC tests and the release — so production, QA and dispatch work from the same record.
- Materials checked against stock before the run starts
- Every step performed by one person and verified by another
- Batch released only when every test passes, then shipped batch-wise
What is ERP software for electrical and electronics manufacturers?
Electrical and electronics manufacturing ERP runs an assembly plant in one system: LEDs, PCBs, drivers, housings and packing in stock by lot, the bill of materials per product, assembly runs, the batch record from SMT to packing, burn-in, safety, lumen and surge tests, and dispatch to distributors — with GST invoices, e-way bills and the accounts on the same records.
ERP Group keeps product line, wattage, cap type, colour temperature and BIS details on each product, works out the components a run needs, flags a shortage before the line starts, and holds the batch until its tests pass.
Last updated: October 2026 · features as they work in ERP Group today
Key facts
| Built for | LED lighting, fans, switches and sockets, wires, inverters and small appliances |
|---|---|
| Bill of materials | Components, PCBs, housings and packing per piece |
| Quality | Burn-in, hi-pot and insulation, lumen output, power factor, surge |
| Batch record | SMT to packing, each step verified |
| Accounts | GST invoices, e-way bills, books; or export to Busy or Tally |
What ERP Group does for an electrical and electronics plant
Components, assembly, testing and distribution on one set of screens — with the stock and the books kept up to date as you go.
Products and specifications
- Product line, wattage, cap type and colour temperature
- BIS registration and MRP on the product
- Components, PCBs and housings per piece
- Versions kept when a design changes
Component store
- LEDs, drivers and PCBs by reel and lot
- Housings, caps, domes and cartons
- Purchase orders and goods receipt
- Reorder levels with draft orders
Assembly runs
- Plan a run on each assembly line
- Shortage shown before the line starts
- Component lots issued to the run
- Labour hours and actual output recorded
Batch record
- SMT, soldering, assembly, burn-in, safety test, packing
- Each step performed and verified by two people
- Deviations recorded on the batch
- Locked once the batch is released
Testing and QC
- Burn-in and hi-pot results per batch
- Lumen output, power factor and surge
- Release, reject or raise a non-conformance
- Test reports attached to the batch
Distributors and dispatch
- Orders from distributors, retailers and projects
- Dispatch batch-wise with the batch on the carton
- GST invoice, e-invoice and e-way bill
- Distributor schemes and outstanding
What do the plant screens look like?
Real screens from an ERP Group demo electrical and electronics plant — the LED bulbs and battens, materials and batches are demo data.
View larger
Manufacturing overview
Open runs, batches waiting for QA, released and rejected batches, average yield and deviations — with yield by recent run.
- Yield against tolerance
- Quality disposition at a glance
- Runs by status
View larger
Production runs
Every run with its product, batch number, quantity, assembly line and status — planned, in progress or completed.
- Plan a run from the BOM
- Filter by status or product
- Open any run for its record
View larger
One production run
The run for Lumio LED Bulb 9 W B22: planned quantity, target batch, assembly line and supervisor, with every material checked against stock — driver PCBs is short.
- Shortage shown before you start
- Labour hours booked to the run
- Start, close, QC and release
View larger
Bill of materials
What goes into a 9 W LED bulb: each material with its quantity, wastage and stock, in versions — plus the routing on your assembly lines.
- Versions kept, old runs unchanged
- Wastage % per material
- Routing steps on work centres
View larger
Batch record
Every step of batch B9-2609-21: what was expected, what was observed, who performed it and who verified it — closed once the batch is released.
- Two people per step
- Deviations block the release
- Locked after release
View larger
QC and release
Theoretical against actual quantity, every QC test with its specification and result, test reports attached, and the release decision.
- Pass / fail against the spec
- Non-conformance and CAPA
- Released for dispatch
Burn-in, safety and lumen checks before a carton is sealed
Each batch has a batch record with these steps, and QC tests against your specification. A step needs a second person to verify it, and the batch cannot be released while a step is open or a test has failed.
How is ERP Group different from Excel and Tally, or a separate production package?
Most electrical and electronics makers plan production in Excel and keep the accounts in Tally or Busy, or buy a production package that does not talk to the books. Here is what changes when it is one system.
| What you need | Excel + Tally / BusyThe usual start | Production package + TallyTwo systems | ERP GroupOne system |
|---|---|---|---|
| Bill of materials with wastage, in versions | A sheet per product | Yes | Yes, old runs keep their version |
| Material shortage before the run starts | Found on the floor | Varies | Yes, checked against live stock |
| Batch record: who did each step and who checked it | Paper registers | Varies | Yes, two people per step |
| QC tests and release before dispatch | Lab register | Usually | Yes — no release, no dispatch |
| Material lots used in each batch | Not recorded | Partly | Yes, lot by lot |
| GST invoice, e-invoice and e-way bill | Typed again in Tally | Entered again in Tally | From the sales order itself |
| Purchase orders, goods receipt and reorder levels | In Tally, by hand | Varies | Yes, draft orders when stock runs low |
| Books, GST data and bank reconciliation | In Tally, separately | In Tally, kept in step by hand | Built in — or export to Busy / Tally |
| Payroll, CRM, dealers and the rest | More software | More software | Same login, add when needed |
"Varies" and "usually": production packages differ — ask your vendor. ERP Group columns are what the software does today.
See it on a demoThe modules a electrical and electronics plant runs on
Production shares its materials, batches and invoices with the rest of ERP Group.
Inventory & Warehouse
Stores, bins and stock by lot — raw materials, work in progress and finished goods.
Warehouse managementPurchase
Purchase orders to component, PCB and housing suppliers, goods receipt, reorder levels and draft orders.
Purchase managementAccounting & GST
Purchase bills, sales invoices, ledgers, GST data and bank reconciliation.
Accounting softwareE-Invoice & E-Way Bill
IRN and signed QR on every invoice, e-way bills for each dispatch.
E-invoice & e-way billDealer Management
Your dealers and distributors, their orders, schemes and outstanding.
Dealer managementTraceability
Batch QR codes, shipments by batch, and a recall that finds every customer.
Traceability softwareHow does a electrical and electronics plant start on ERP Group?
More for manufacturers
See your plant on ERP Group
Tell us what you make — lighting, fans, switches or devices — and how many lines you run. We'll show you a run from components to burn-in and distributor dispatch on a demo plant.