Medical Device Manufacturing ERP every device traceable by serial number
Patient monitors, diagnostic devices and disposables — components by lot, ESD-safe assembly, device history records, IEC 60601 safety and function tests, serial numbers and dispatch in one system, with GST billing built in.
Every production run, from materials to dispatch
The run carries its bill of materials, the material lots it used, the device history record filled step by step, the QC tests and the release — so production, QA and dispatch work from the same record.
- Materials checked against stock before the run starts
- Every step performed by one person and verified by another
- Batch released only when every test passes, then shipped batch-wise
What is software for medical device makers?
Medical Device Manufacturing ERP runs a medical device plant in one system: PCBs, displays, batteries and accessories by lot, the bill of materials per device, assembly runs, the device history record from kit verification to labelling, electrical safety, function and accuracy tests, and dispatch to distributors and hospitals — with GST invoices, e-way bills and the accounts on the same records.
ERP Group keeps device class, model, licence and sterility on each product, works out the components a run needs, flags a shortage before assembly, and holds the batch until its tests pass — every device traceable to its component lots.
Last updated: October 2026 · features as they work in ERP Group today
Key facts
| Built for | Medical electronics, diagnostic devices, disposables and implant makers (CDSCO / MDR 2017) |
|---|---|
| Bill of materials | PCBs, displays, batteries, housings, accessories and packing per device |
| Quality | Electrical safety, Functional test, Calibration / accuracy |
| Device history record | Incoming kit verification to Final test & labelling, each step verified |
| Accounts | GST invoices, e-way bills, books; or export to Busy or Tally |
What ERP Group does for a medical device plant
Materials, production, quality and dispatch on one set of screens — with the stock and the books kept up to date as you go.
Devices and licences
- Device class, model and licence
- Sterility and shelf life
- Components per device
- Versions kept when a design changes
Component store
- PCBs, displays and batteries by lot
- Accessories, IFUs and packing
- Purchase orders and goods receipt
- Reorder levels with draft orders
Assembly cell runs
- Plan a run on each assembly cell
- Shortage shown before the run starts
- Material lots issued to the run
- Labour hours and actual output recorded
Device history record
- Incoming kit verification, Sub-assembly (PCB + display), Final assembly and more
- Each step performed and verified by two people
- Deviations recorded on the batch
- Locked once the batch is released
Safety and function tests
- Electrical safety, Functional test
- Calibration / accuracy
- Release, reject or raise a non-conformance
- Test reports attached to the batch
Distributors and hospitals
- Orders from distributors, hospitals and tenders
- Dispatch batch-wise with serial numbers
- GST invoice, e-invoice and e-way bill
- Outstanding and collections per customer
What do the plant screens look like?
Real screens from an ERP Group demo medical device plant — the medical devices, materials and batches are demo data.
View larger
Manufacturing overview
Open runs, batches waiting for QA, released and rejected batches, average yield and deviations — with yield by recent run.
- Yield against tolerance
- Quality disposition at a glance
- Runs by status
View larger
Production runs
Every run with its product, batch number, quantity, assembly cell and status — planned, in progress or completed.
- Plan a run from the BOM
- Filter by status or product
- Open any run for its record
View larger
One production run
The run for Patient Monitor PM-500 (5-parameter): planned quantity, target batch, assembly cell and supervisor, with every material checked against stock — TFT LCD 10.1" with Touch is short.
- Shortage shown before you start
- Labour hours booked to the run
- Start, close, QC and release
View larger
Bill of materials
What goes into a patient monitor: each material with its quantity, wastage and stock, in versions — plus the routing on your assembly cells.
- Versions kept, old runs unchanged
- Wastage % per material
- Routing steps on work centres
View larger
Device history record
Every step of batch PM500-2609-06: what was expected, what was observed, who performed it and who verified it — closed once the batch is released.
- Two people per step
- Deviations block the release
- Locked after release
View larger
QC and release
Theoretical against actual quantity, every QC test with its specification and result, test reports attached, and the release decision.
- Pass / fail against the spec
- Non-conformance and CAPA
- Released for dispatch
See a plant run on ERP Group
A walk-through of the production screens — shown for a general manufacturing unit; medical device manufacturing businesses work in the same screens, with their own materials, steps and tests.
- PlanBills of materials and production runs
- Make and checkBatch record, QC tests and release
- DispatchSales orders, invoices and shipments by batch
Electrical safety, function and accuracy before a device is labelled
Each batch has a device history record with these steps, and QC tests against your specification. A step needs a second person to verify it, and the batch cannot be released while a step is open or a test has failed.
How is ERP Group different from Excel and Tally, or a separate production package?
Most medical device makers plan production in Excel and keep the accounts in Tally or Busy, or buy a production package that does not talk to the books. Here is what changes when it is one system.
| What you need | Excel + Tally / BusyThe usual start | Production package + TallyTwo systems | ERP GroupOne system |
|---|---|---|---|
| Bill of materials with wastage, in versions | A sheet per product | Yes | Yes, old runs keep their version |
| Material shortage before the run starts | Found on the floor | Varies | Yes, checked against live stock |
| Device history record: who did each step and who checked it | Paper registers | Varies | Yes, two people per step |
| QC tests and release before dispatch | Lab register | Usually | Yes — no release, no dispatch |
| Material lots used in each batch | Not recorded | Partly | Yes, lot by lot |
| GST invoice, e-invoice and e-way bill | Typed again in Tally | Entered again in Tally | From the sales order itself |
| Purchase orders, goods receipt and reorder levels | In Tally, by hand | Varies | Yes, draft orders when stock runs low |
| Books, GST data and bank reconciliation | In Tally, separately | In Tally, kept in step by hand | Built in — or export to Busy / Tally |
| Payroll, CRM, dealers and the rest | More software | More software | Same login, add when needed |
"Varies" and "usually": production packages differ — ask your vendor. ERP Group columns are what the software does today.
See it on a demoThe modules a medical device plant runs on
Production shares its materials, batches and invoices with the rest of ERP Group.
Inventory & Warehouse
Stores, bins and stock by lot — raw materials, work in progress and finished goods.
Warehouse managementPurchase
Purchase orders to PCB, display, battery and accessory suppliers, goods receipt, reorder levels and draft orders.
Purchase managementAccounting & GST
Purchase bills, sales invoices, ledgers, GST data and bank reconciliation.
Accounting softwareE-Invoice & E-Way Bill
IRN and signed QR on every invoice, e-way bills for each dispatch.
E-invoice & e-way billDealer Management
Your dealers and distributors, their orders, schemes and outstanding.
Dealer managementTraceability
Batch QR codes, shipments by batch, and a recall that finds every customer.
Traceability softwareHow does a medical device plant start on ERP Group?
More for manufacturers
See your plant on ERP Group
Tell us which devices you make and how you sell them. We'll show you a batch from component lots to the safety test and dispatch on a demo device plant.