Pumps, Valves & Machinery ERP from casting to test bench
Pumps, motors, valves and machines — castings and bought-out parts, assembly runs, winding, bench and safety tests, and dispatch to dealers in one system, with GST billing built in.
Every production run, from materials to dispatch
The run carries its bill of materials, the material lots it used, the build record filled step by step, the QC tests and the release — so production, QA and dispatch work from the same record.
- Materials checked against stock before the run starts
- Every step performed by one person and verified by another
- Batch released only when every test passes, then shipped batch-wise
What is ERP software for pump, valve and machinery makers?
Pumps, valves and machinery ERP runs an engineering plant in one system: castings, bars, winding wire and bought-out parts in stock, the bill of materials per machine, assembly runs, the build record from machining to painting, performance, high-voltage and leak tests, and dispatch to dealers and projects — with GST invoices, e-way bills and the accounts on the same records.
ERP Group keeps machine type, power, phase, head range and the IS standard on each product, works out the castings and parts a run needs, flags a shortage before assembly starts, and holds the batch until its bench tests pass.
Last updated: October 2026 · features as they work in ERP Group today
Key facts
| Built for | Monoblock and submersible pumps, motors, valves, compressors and small machines |
|---|---|
| Bill of materials | Castings, bars, winding wire and bought-out parts per machine |
| Quality | Bench performance against the curve, HV and insulation, leak tests |
| Build record | Machining to packing, each step verified |
| Accounts | GST invoices, e-way bills, books; or export to Busy or Tally |
What ERP Group does for a pumps and machinery plant
Parts, assembly, testing and dealers on one set of screens — with the stock and the books kept up to date as you go.
Machines and specifications
- Machine type, power, phase and head range
- IS standard on each product
- Castings, bars, wire and bought-outs per machine
- Versions kept when a design changes
Castings and bought-out store
- Castings by drawing number and grade
- Bearings, seals and stage sets with reorder levels
- Purchase orders to foundries and suppliers
- Stock by store, rack and bin
Assembly runs
- Plan a run on each assembly bay
- Shortage shown before assembly starts
- Parts issued to the run by lot
- Labour hours and actual output recorded
Build record
- Machining, winding, assembly, testing, painting, packing
- Each step performed and verified by two people
- Deviations recorded on the batch
- Locked once the batch is released
Bench and safety tests
- Head and discharge against the pump curve
- High-voltage, insulation and leak tests
- Release, reject or raise a non-conformance
- Test certificates attached to the batch
Dealers and dispatch
- Orders from dealers, OEMs and projects
- Dispatch batch-wise with serial numbers
- GST invoice, e-invoice and e-way bill
- Dealer outstanding, schemes and service
What do the plant screens look like?
Real screens from an ERP Group demo pumps and machinery plant — the pumps and motors, materials and batches are demo data.
View larger
Manufacturing overview
Open runs, batches waiting for QA, released and rejected batches, average yield and deviations — with yield by recent run.
- Yield against tolerance
- Quality disposition at a glance
- Runs by status
View larger
Production runs
Every run with its product, batch number, quantity, assembly bay and status — planned, in progress or completed.
- Plan a run from the BOM
- Filter by status or product
- Open any run for its record
View larger
One production run
The run for Kovai 1 HP Single Phase Monoblock Pump: planned quantity, target batch, assembly bay and supervisor, with every material checked against stock — bronze impellers is short.
- Shortage shown before you start
- Labour hours booked to the run
- Start, close, QC and release
View larger
Bill of materials
What goes into a monoblock or a submersible pump: each material with its quantity, wastage and stock, in versions — plus the routing on your assembly bays.
- Versions kept, old runs unchanged
- Wastage % per material
- Routing steps on work centres
View larger
Build record
Every step of batch M1-2609-14: what was expected, what was observed, who performed it and who verified it — closed once the batch is released.
- Two people per step
- Deviations block the release
- Locked after release
View larger
QC and release
Theoretical against actual quantity, every QC test with its specification and result, test reports attached, and the release decision.
- Pass / fail against the spec
- Non-conformance and CAPA
- Released for dispatch
See a plant run on ERP Group
A walk-through of the production screens — shown for a sheet metal and tool room unit; pump, valve and machine makers work in the same screens, with their own materials, steps and tests.
- PlanBills of materials and production runs
- Make and checkBatch record, QC tests and release
- DispatchSales orders, invoices and shipments by batch
Every pump tested on the bench before it is packed
Each batch has a build record with these steps, and QC tests against your specification. A step needs a second person to verify it, and the batch cannot be released while a step is open or a test has failed.
How is ERP Group different from Excel and Tally, or a separate production package?
Most pump, valve and machine makers plan production in Excel and keep the accounts in Tally or Busy, or buy a production package that does not talk to the books. Here is what changes when it is one system.
| What you need | Excel + Tally / BusyThe usual start | Production package + TallyTwo systems | ERP GroupOne system |
|---|---|---|---|
| Bill of materials with wastage, in versions | A sheet per product | Yes | Yes, old runs keep their version |
| Material shortage before the run starts | Found on the floor | Varies | Yes, checked against live stock |
| Build record: who did each step and who checked it | Paper registers | Varies | Yes, two people per step |
| QC tests and release before dispatch | Lab register | Usually | Yes — no release, no dispatch |
| Material lots used in each batch | Not recorded | Partly | Yes, lot by lot |
| GST invoice, e-invoice and e-way bill | Typed again in Tally | Entered again in Tally | From the sales order itself |
| Purchase orders, goods receipt and reorder levels | In Tally, by hand | Varies | Yes, draft orders when stock runs low |
| Books, GST data and bank reconciliation | In Tally, separately | In Tally, kept in step by hand | Built in — or export to Busy / Tally |
| Payroll, CRM, dealers and the rest | More software | More software | Same login, add when needed |
"Varies" and "usually": production packages differ — ask your vendor. ERP Group columns are what the software does today.
See it on a demoThe modules a pumps and machinery plant runs on
Production shares its materials, batches and invoices with the rest of ERP Group.
Inventory & Warehouse
Stores, bins and stock by lot — raw materials, work in progress and finished goods.
Warehouse managementPurchase
Purchase orders to foundries, bar, wire and bearing suppliers, goods receipt, reorder levels and draft orders.
Purchase managementAccounting & GST
Purchase bills, sales invoices, ledgers, GST data and bank reconciliation.
Accounting softwareE-Invoice & E-Way Bill
IRN and signed QR on every invoice, e-way bills for each dispatch.
E-invoice & e-way billDealer Management
Your dealers and distributors, their orders, schemes and outstanding.
Dealer managementTraceability
Batch QR codes, shipments by batch, and a recall that finds every customer.
Traceability softwareHow does a pumps and machinery plant start on ERP Group?
More for manufacturers
See your plant on ERP Group
Tell us what you build — pumps, motors, valves or machines — and how many assembly bays you run. We'll show you a run from castings to the bench test and dealer dispatch on a demo plant.